One of our major filed is to design and optimise the supplying resources in a warehouse or factory. The term resource means not only the type and number of the machine tools but the human resources as well.
At the optimisation process we take into consideration the following attributes of the human workforce: qualification, authority, shifts, etc. We have also a big experience in the modelling of manual task implementation.
We use simulation to resource optimisation, because we consider it to the most efficient and diverse tool.
Topic related references:
Customer | Location | Description |
UNILEVER MAGYARORSZÁG KFT. | Röszke | Automatic weight metering-system design with simualtion analysis in the production area |
WABERER’S LOGISZTIKA KFT. | Budapest | Startegy and operational level process design at K1 warehouse, simulation based system and process design |
BÉKÁS KFT. | Budapest | Central distriution warehouse design. Simulation based process development |
CORWELL ill. MILLER ÉS MORRISON KFT. | Dunakeszi | Central distribution warehouse enlargement design. Half-automatic order picking system design with simulation |
BPW HUNGÁRIA KFT. | Szombathely | Central production service conceltional level design. Warehouse simulation and resource optimisation |
MARZEK-KNER PACKAGING KFt. | Békéscsaba | Production system topology redesign |
UNILEVER MAGYARORSZÁG KFT. | Röszke | Manufacturing capacity reserve exploration with simulation tool |
UNILEVER MAGYARORSZÁG KFT. | Röszke | Simulation based design in point of enlargement possibilities - Concept planning |
WABERER’S Logisztika KFT. | Budapest | Simulation based warehouse analysis tool design that is integrated in a warehouse informatic software |
BPW HUNGÁRIA KFT. | Szombathely | Production service system simulation based design |