One of our major filed is to design and optimise the supplying resources in a warehouse or factory. The term resource means not only the type and number of the machine tools but the human resources as well. 

At the optimisation process we take into consideration the following attributes of the human workforce: qualification, authority, shifts, etc. We have also a big experience in the modelling of manual task implementation.

We use simulation to resource optimisation, because we consider it to the most efficient and diverse tool.

 

Topic related references:

 

Customer Location Description
UNILEVER MAGYARORSZÁG KFT. Röszke Automatic weight metering-system design with simualtion analysis in the production area
WABERER’S LOGISZTIKA KFT. Budapest Startegy and operational level process design at K1 warehouse, simulation based system and process design
BÉKÁS KFT. Budapest Central distriution warehouse design. Simulation based process development
CORWELL ill. MILLER ÉS MORRISON KFT. Dunakeszi Central distribution warehouse enlargement design. Half-automatic order picking system design with simulation
BPW HUNGÁRIA KFT. Szombathely Central production service conceltional level design. Warehouse simulation and resource optimisation
MARZEK-KNER PACKAGING KFt. Békéscsaba Production system topology redesign
UNILEVER MAGYARORSZÁG KFT. Röszke Manufacturing capacity reserve exploration with simulation tool 
UNILEVER MAGYARORSZÁG KFT. Röszke Simulation based design in point of enlargement possibilities - Concept planning
WABERER’S Logisztika KFT. Budapest Simulation based warehouse analysis tool design that is integrated in a warehouse informatic software
BPW HUNGÁRIA KFT. Szombathely Production service system simulation based design