BILK Logistics Plc. has more than 207.000 m2 of warehouse and office space at its disposal. The 25-building site operated by professional facility management comprises refrigerated, tempered, ADR, cross dock, high and normal warehouses with state-of-the-art techology, as well as a property with direct siding connection covering all modern logistics needs. With the exception of ADR warehouses, each facility is equipped with an automatic fire extinguishing system and the offices are air conditioned.
Our project assignment was to prepare a utilization concept plan of the site, create a logistics plan for different types of warehouses and determine adequate storing and handling technologies in each building. We participated in the whole design process from concept level to realization, and contributed to the design of internal warehouse processes.
Our tasks accomplished:
- Create concept-level alternatives, coordination meeting
- Logistics design of different types warehouses
- Design and specification of rack- and forklift systems for each warehouse, professional support in competitive tendering
- Development of task-specific process management for each warehouse
- Continuous logistics consultancy


