Robert Bosch Power Tool Ltd. was founded in Miskolc in November 2001, and has become a definitive factor in the region as well as being Bosch’s largest power tool plant worldwide.
Our task was to orchestrate a bottleneck investigation and a comprehensive simulation analysis on the subject of the complex production supply system in the tool factory. The simulation model was made within the SIEMENS TECNOMATIX PLANT SIMULATION framework.
Results and experiences of the project was presented in summer of 2023 as a part of a workshop organized by HALPIM.
Our tasks accomplished:
- Building a simulation model of the complex system
- Bottleneck analysis, throughput planning


